# Dongguan urban renewal — CSCEC Eighth Bureau reference

> Four dispatch sheets name the Dongguan China Construction project office; correspondence mentions CSCEC Eighth Bureau and Hongfu Road. The project name follows the supplier's description.

Canonical HTML: https://kaizhongstone.com/en/projects/cscec8-dongguan
Described by: https://kaizhongstone.com/en/llms.txt
Content: public page body; navigation and interactive controls omitted. Dates appear with the source content.



## Dongguan urban renewal — CSCEC Eighth Bureau reference

Four dispatch sheets name the Dongguan China Construction project office; correspondence mentions CSCEC Eighth Bureau and Hongfu Road. The project name follows the supplier's description.

Updated：2026-09-11

## Material and record summary

White granite kerbs, curved pieces and drainage components

| Item | Record |
| --- | --- |
| 2025-08-12 | 191 pieces (quantity column) |
| 2025-09-08 | 32 pieces / 18.816 m |
| 2025-10-28 | 82 pieces |
| 2025-11-14 | 13 pieces |

The drainage-channel reference is not evidence of this project's site. Different measurement units are not combined.

[Related granite product →](https://kaizhongstone.com/en/products/granite-curbstone)

## Supporting images

Original records are in Chinese. Open an image to inspect the full supplied document.

[![Dongguan urban renewal — CSCEC Eighth Bureau reference — supporting record 1](https://kaizhongstone.com/images/cases/cscec8-dongguan/evidence-01.webp)

Open full record 1](https://kaizhongstone.com/images/cases/cscec8-dongguan/evidence-01.webp)

[![Dongguan urban renewal — CSCEC Eighth Bureau reference — supporting record 2](https://kaizhongstone.com/images/cases/cscec8-dongguan/evidence-02.webp)

Open full record 2](https://kaizhongstone.com/images/cases/cscec8-dongguan/evidence-02.webp)

[![Dongguan urban renewal — CSCEC Eighth Bureau reference — supporting record 3](https://kaizhongstone.com/images/cases/cscec8-dongguan/evidence-03.webp)

Open full record 3](https://kaizhongstone.com/images/cases/cscec8-dongguan/evidence-03.webp)

[![Dongguan urban renewal — CSCEC Eighth Bureau reference — supporting record 4](https://kaizhongstone.com/images/cases/cscec8-dongguan/evidence-04.webp)

Open full record 4](https://kaizhongstone.com/images/cases/cscec8-dongguan/evidence-04.webp)

[![Dongguan urban renewal — CSCEC Eighth Bureau reference — supporting record 5](https://kaizhongstone.com/images/cases/cscec8-dongguan/evidence-05.webp)

Open full record 5](https://kaizhongstone.com/images/cases/cscec8-dongguan/evidence-05.webp)

Source: Shandong Kaizhong Stone Co., Ltd. Redacted records supplied by the company. Project attribution and fulfilment are not independently verified. No endorsement, certification or authorisation by the named parties is implied.

## Need stone for a similar project?

Send stone, dimensions, finish, quantity and destination. Opening a communication app does not send an enquiry.

[Prepare a project enquiry →](https://kaizhongstone.com/en/contact?case=cscec8-dongguan)

## Source and limitations

First-party source: Shandong Kaizhong Stone Co., Ltd. Capacity figures are company-provided. Project specifications, test values, price and delivery require current supporting records and written confirmation.

- [Company information](https://kaizhongstone.com/en/about)
- [Factory capacity](https://kaizhongstone.com/en/factory-capacity)
- [Contact procurement](https://kaizhongstone.com/en/contact)
